I&C Engineer, (source code GEHN) - Engineering Resume Search
I&C Engineer, (source code GEHN) - Engineering Resume Search
My Spider Scam Awareness Contacting Us F. A. Q.
 
Job Seekers
Search Jobs
Browse Jobs
Post a Resume
Job Alerts
 
Employers
Search Resumes
Browse Resumes
Post a Job

I&C Engineer, (source code GEHN) Resume


Desired Industry: Engineering SpiderID: 70395
Desired Job Location: Charlotte, North Carolina Date Posted: 10/10/2013
Type of Position: Full-Time Permanent Availability Date: 12/2/2013
Desired Wage: negotiable
U.S. Work Authorization: Yes
Job Level: Management (Manager, Director) Willing to Travel: Yes, Less Than 25%
Highest Degree Attained: Bachelors Willing to Relocate: No


Objective:
I have served as Instrumentation and Controls (I&C)
Engineer IV at AREVA NP since July 2006. My
experience during this period has included projects
involve modifications required in the plants, such as:
Develop I&C/ electrical Design Change Package (DCP)
for replacing four (4) steam generators for Salem
Nuclear Plant include instrument specification,
electrical wiring, loop& schematic diagrams, cabinet
wiring, instrument list, etc.
Revise and modify several calculations and develop
evaluation of RPS/NI systems for EPU project in CR-3.
Develop Logic Diagrams for RPS/NI and BOP systems,
for Bellefonte project as well as Input-Output list.


Experience:
AREVA NP Inc., Charlotte, NC 07/2006 - Present
Engineer IV
• Bellefonte Plant: Developed several Logic
Diagrams for RPS/NI and BOP Systems, Input / Output
List, I&C Drawing List, and involved in the 10% design
package
• TMI-1: Revised several calculations and reviewed
design and SPECS for instrumentation of RC
Hot Leg RTD replacement
• CR-3: Revised Calculations for Steam Pressure
for Head Balance Computation
• Developed the Evaluation of RPS/NI Systems for
EPU Project in CR-3
• Salem Nuclear Plant: Develop I&C/ electrical
Design Change Package (DCP) for replacing four (4)
steam generators for include electrical wirings, Loop
Diagrams, cabinet wiring, etc.
• Brunswick Plant (BNP): Reviewed and revised I&C
documents
• Completed my assigned tasks, technically
correct and within the time schedule frame to meet
the customer’s complete expectation and satisfaction
• Maintaining good customer relationship.
• Active team member with I& C group and other
groups.
• Attend and participate in the project weekly
meeting to 
discuss the schedule and the design
progress with the 
project team.
• Using the appropriate Code of Federal
Regulations 
(CFR) of the Nuclear Regulatory
Commission (NRC) and IEEE 

The Shaw Group, Inc. Charlotte, NC 04/2000 –
07/2006
Senior I&C) Engineer
• Design the instrumentation and control systems
for the Mixed Oxide Fuel Fabrication Facility project
(MOX-MFFF), which will convert the weapons-graded
plutonium to fuel assemblies to be used in
commercial nuclear power reactors.
• Spend six (6) moths assignment in France,
working in the SGN office with the Electrical/ I&C
Group
• Visited MELOX and LAHAUG Plants in France and
gained knowledge and experience with the various
steps of manufacturing the MOX Fuel Assemblies,
starting from the first step of how to make the
Pellets.
• Worked with the process engineers as an active
team player to develop the piping and
instrumentation diagrams (P&IDs)
• Developed Systems Description Documents
(SDD.)
• Developed Logic and Schematic Diagrams.
• Involved and participate in several Process
Hazard Analysis (PHA) review meetings and use the
appropriate Code of Federal Regulations (CFR) of the
Nuclear Regulatory Commission (NRC) 

Okuma America company, Charlotte, NC 4/1998 -
12/1999

Electrical and Instrumentation Engineer 

• Provided electrical design for machine tools
including wiring and schematic diagrams, power
distribution, grounding, control system, PLC, bill of
material, electrical layout and using AutoCAD
• Involved in the startup and troubleshooting of
the new machines and equipment
• Specified and purchased reliable instruments
and electrical components.
Hoechst Celanese, Mt. Holly, NC 10/1992 - 12/1997
Electrical and Instrumentation Engineer
• Managed several capital projects simultaneously
• Used Programmable Logic Controller (PLC) and
Distribution Control System (DCS) to automate
several manual process control system.
• Provided technical support to construction
group during installation and startup.
• Assisted in troubleshooting and solving
problems.
• Active team player within the I&C group and all
other groups
• Participated in the HAZOPS review meeting. 

Fluor Daniel, Inc., Greenville, SC 06/1987 - 08/1992 

Staff Engineer
• Worked in several projects for the client (DuPont
Company)
• Provided the I&C scope of work for several
projects
• Provided a complete project engineering and
design service for the electrical, instrumentation and
control portion of the project including:
• Logic, schematic, one line diagrams, PLC
software and hardware, P&ID diagrams, instrument
list, and specification 

WIX Filters Corporation, Gastonia, N C 04/1986 -
05/1987 

Staff Engineer
• Used PLC to automate manual control system
operation, with implementation of safety interlocks
and network.
• Project scope of work, studies and justification.
• Instruments and controls Specification.
• Supervised electrical maintenance personnel and
assisted in troubleshooting. 

Firestone Fibers & Textile Co, Gastonia, NC 05/1983
- 02/1986 

Staff Engineer
• Charged of the electrical and I&C maintenance of
the Tire Cord Treating Unit.
• Prepared preventive maintenance program to
technicians and 
maintenance group.
• Assisted the maintenance group in
troubleshooting of DC and AC drives and motors,
controls and multi-burner temperature controls.
• Designed low voltage distribution system.
• Upgraded the control of the existing machines
from manual to automatic control, using
Programmable Logic Controllers (PLC)


Education:
Bachelor of Science in Electrical Engineering from
Alexandria University in Egypt

CONTINUING EDUCATION:
Completed PLC and DCS courses

Member of Women In Nuclear (WIN) Society


Affiliations:
Member of Women In Nuclear (WIN) Society


Skills:
• Completed my assigned tasks, technically
correct and within the time schedule frame to meet
the customer’s complete expectation and satisfaction
• Maintaining good customer relationship.
• Active team member with I& C group and other
groups.
• Attend and participate in the project weekly
meeting to 
discuss the schedule and the design
progress with the 
project team.
• Using the appropriate Code of Federal
Regulations 
(CFR) of the Nuclear Regulatory
Commission (NRC) and IEEE


Additional Information:
INDUSTRY EXPERIENCE
Nuclear Power Design
Chemical Plants
Manufacturing


Reference:
Available upon request.


Candidate Contact Information:
JobSpider.com has chosen not to make contact information available on this page.
Click "Contact Candidate" to send this candidate a response.


    





© 2021 Job Spider
Privacy Policy | CC Marketing Sites | Site Map | Links