Project Manager - Information Technology Resume Search
Project Manager - Information Technology Resume Search
My Spider Scam Awareness Contacting Us F. A. Q.
 
Job Seekers
Search Jobs
Browse Jobs
Post a Resume
Job Alerts
 
Employers
Search Resumes
Browse Resumes
Post a Job

Project Manager Resume


Desired Industry: Information Technology SpiderID: 80216
Desired Job Location: Columbus, Ohio Date Posted: 11/22/2017
Type of Position: Full-Time Permanent Availability Date:
Desired Wage:
U.S. Work Authorization: Yes
Job Level: Management (Manager, Director) Willing to Travel: Yes, 50-75%
Highest Degree Attained: Masters Willing to Relocate: Yes


Objective:
Forward-thinking, performance-focused, and goal-oriented professional, equipped with extensive experience within the oil and gas industry. Armed with proven capabilities in facilitating well and field performance monitoring to maximize oil production and minimize operational costs. Adept at guiding and motivating petroleum engineers; implementing strategic methods and technologies; and multitasking within fast-paced environments with the ability to drive optimum results. Knowledgeable of health, safety and environmental (HSE) industry policies. Articulate communicator; bilingual in English and Spanish.


Experience:
Weatherford, Kuwait, Kuwait
Software and Production Optimization Consulting Country Manager 2017–Present
Fulfill multiple roles, such as Kuwait Integrated Digital Oil Field (KwIDF) project manager, as well as software and production optimization consulting (POC)
Perform key responsibilities, which involve supervising Collaboration Work Environment (CWE) Team by assigning their tasks; coordinating real-time data validation and production debottleneck analysis; and drafting monthly progress reports
Preside over daily review meetings with Gathering Center Team, Field Development Management, and Production Operation
Organize and carry out weekly maintenance meetings with Maintenance Team and Field Development Team which involve the preparation and distribution of minutes of meetings
Function as specialist on well optimization and artificial lift selection, responsible for the evaluation and optimization natural flowing, ESP, SRP, PCP and Gas Lifted wells.
Evaluate idle field and wells to return them to production target after shutting period.
Take part in studies to provide logistics and wellsite supervision for new drills and workover candidates.
Coordinate well intervention programs to replace artificial lift equipment, remedial treatments, and cleanouts
Administer software development requirements and execution for CWE
Team up with Kuwait Oil Company Information Technology (KOC IT) on OS 2012 and Oracle DB installation for the implementation of i-DO 6.0
Work on technical proposal update for resubmission to KOC for approval
Take charge of creating and submitting service tickets of resources for approval
Support and maintain the organization’s CWE Center

Shell International, Seria, Brunei
Senior WRFM (Well, Reservoir and Facility Management) Improvement Production Technology 2013–2016
Defined all WRFM activities with specific responsibility as Senior PT for all well interventions
Oversaw all wells by carrying out risk assessments and implementing risk mitigation measures
Managed key interfaces involved with Petroleum Engineering, Production Operations, Integrated Activity Planning, Programming, Well Services, Process Engineering and Maintenance
Enforced business improvement initiatives in order to drive the team towards world-class WRFM performance
Fulfilled line supervisor responsibility, which involved coaching and mentoring of junior staff and QA/QC of technical work
Developed and implemented different projects:
Sand Management Control Implementation – Define and Implement the safety Critical elements
Gas Lift Real Time Optimization – Review, Update and Implement
Annulus Pressure Monitoring – Well Integrity
LEAN Implementation to the Well Operating Envelopes – Waste Reduction and Process Improvement

Qatar Petroleum, Doha, Qatar
Petroleum Engineer 2008–2013
Played role of technical advisor, accountable for implementation of methods and technology, delivery of non-routine production technology support, and execution of field trials
Served as a focal point for quality management system (QMS) by rendering support to the Qatarization

PDVSA, Various Locations
Reservoir Engineer, Maracaibo, Venezuela 2006–2008
Established vertical and horizontal well locations, while performing conventional reservoir analysis of various patterns of reservoir development to assess the recovery factor through different water injection patterns
Acted as Eocene reservoir team leader and younger petroleum engineers mentor


Education:
Master of Business Administration in Oil and Gas Management: In Progress (Expected Completion Date: Feb 2018)
(Magíster en Gestión en la Industria de los Hidrocarburos)
Universidad Viña del Mar, Chile (Online)

Bachelor of Science in Petroleum Engineering
Universidad del Zulia (LUZ), Maracaibo, Venezuela


Affiliations:
Society of Petroleum Engineers (SPE)


Skills:
Petroleum Engineering | Reservoir Management and Simulation | Well Testing | Risk Assessment | Project Management
Field Testing | Regulatory Compliance | General Management | Project Planning, Development, and Control


Additional Information:
PRojects

Project Name: Sand Management Control Implementation – Define and Implement the Safety Critical Elements 2014–2016
Role: Project Manager and Senior WRFM Engineer Company: Shell International
Created a tool using real-time databases to update well status on a daily basis
Boosted HSE reliability due to sand production from 25% up to 90% in less than six months

Project Name: Gas Lift Real Time Optimization – Review, Update, and Implement 2014–2016
Role: Project Manager and Senior WRFM Production Technology Engineer Company: Shell International
Devised a troubleshooting tools through the use of available real-time data and high knowledge of gas lift

Project Name: Annulus Pressure Monitoring – Well Integrity 2014–2016
Role: Project Manager Company: Shell International
Made use of an Excel tool for daily monitoring of routine, thus minimizing waste time by 30 minutes per day

Project Name: LEAN Implementation to the Well Operating Envelopes – Waste Reduction and Process Improvement 2014–2016
Role: Project Manager Company: Shell International
Significantly decreased process of 1.7 days per week and an increment of 65% to 97% of the well production and injection inside the safety limits; and from 38% to 82% of the wells production and injection inside of the operating window





Project Name: Intelligent Subsea Dumpflood Well Completions and Acoustic Data Acquisition System 2008–2013
Role: Project Manager and Team Leader Company: Qatar Petroleum
Developed cost-effective solution by conducting a feasibility study, determining scope of work, creating a business case, and providing support to contract preparation
Tracked flow rate and pressure consequently reducing human risk and intervention

Project Name: Lightweight Subsea Intervention Equipment 2008–2013
Role: Project Manager and Team Leader Company: Qatar Petroleum
Instituted ranking and selection of best reliable and fit for purpose technology available in the market to enforce interventions in subsea wells
Led the minimization of risks by applying the minimum standards of pressure support control barriers

Project Name: Monitoring Technique for Flow in Long Open Hole Horizontal Wells (DTS + DAS) 2008–2013
Role: Project Manager and Team Leader Company: Qatar Petroleum
Facilitated technology identification, business case preparation, and company selection for the provision of required techniques and equipment to determine and monitor the flow profile exiting in open-hole long horizontal wells

Project Name: Water Shut Off Technology 2008–2013
Role: Project Manager and Team Leader Company: Qatar Petroleum
Held accountability in defining the most reliable chemical/mechanical technology in shutting off or decreasing water production on a well

Project Name: Application of Tracer Technology in Offshore Fields 2008–2013
Role: Project Manager and Team Leader Company: Qatar Petroleum
Applied strategic approach in selecting the most appropriate non-radioactive tracer technology to be executed in the current offshore water injection project

Activities

Boy Scout Leader

Technical Skills

Microsoft Office Applications (Word, Excel, PowerPoint, Outlook, Project and Visio)
Real Time Data and Historian Tools (PI ProcessBook and Cygnet) | Real Time Data Analytical tools (i-DO and ForeSite)
Well Optimization and Nodal Analysis Tools (WellFLo, Well Evaluation Model and Prosper)

PUBLICATIONS (selected to be presented on International Oil and gas exibitions)

Application of Real-Time Data and Integrated Models in an Automated Workflow for Production Surveillance and Analysis in Burgan Oil Field
Installation of a Sucker Rod Pumping System over a Failed Progressive Cavity Pump to Recover Production Using Rigless Intervention - Burgan Field - South East Kuwait
Integrated Deployment of Digital oil Field in Multiple Kuwait Areas in One Platform and Benefits Realized
Real Time Intelligent Alarm and Surveillance System in Heavy Oil Project- North Kuwait
Smart Workflows for Well and Facility Surveillance and Optimization: A Burgan Oil Field Experience


Candidate Contact Information:
JobSpider.com has chosen not to make contact information available on this page.
Click "Contact Candidate" to send this candidate a response.


    





© 2018 Job Spider
Privacy Policy | CC Marketing Sites | Site Map | Links